The road and the tank
             

Image 1

  Image 2    
The site hut building going up.   The area for the water tanks almost dug out.   Then it rained.   Then the sides caved in
             
     
However, we managed to get back in.   And get all the steels for the column footings concreted in.   Then we had a lot more rain.   And the track got so bad.
             
     
So we decided that we had better concrete the track from the main road down to the site.   300 yards long.   And all mixed by hand.  
Eventually the tank dried out.
             
     
And we concreted the base.   Built the brick walls.   Plastered them.   And finally the water tanks were finished.
             
             
           
Decking out the water tanks.            
             
Staff accommodation building
             
     
Concreting the top of the water tank for the staff accommodation.   Starting the walls.   Floor joists in.   On with the 2nd floor.
             
     
Staff bedroom with a view.   Rafters on.   And on with the roof ply.   At last, the roof sheets
             

         
Some paint and some landscaping   And looking pretty        
           
Bar and restaurant
             
     
Cutting ground for bar / restaurant.   Not sure what we will do with it all.   Footings go in for bar and restaurant.  

Nearly ready to put steel in.

 

             
tying in the steel   Steel ready   Starting concrete   finished concrete
Tying in the steel   Ready for concrete   Starting concrete   Finished concrete
             
Start blocks   bedroom with view    
On with the blocks   A Bedroom!!   Decking the restaurant floor   Then the steel.
             
     
The kitchen needs a lot of pipework   More concrete   Kitchen and office/reception taking shape   And at last we can start the bar!
             
     
Bar window with a view   First roof timbers on   Soon be ready for tiles   Tiling with a view
             
       
From the beach   with some ballusters   and some guttering    
             
Cottages            
             
     
First cottage   First cottage roof timbers on.   Then the tiles.   2nd Cottage footings started
             
  tiles on 2nd cot    
3rd Cottage footings & roof timbers going on 2nd cottage   Tiles on 2nd cottage   Roof timbers on third.   And tiles on the third!
             
     
Footings for the 5th & 6th   1st, 2nd, 3rd, 4th & staff accom from the beach.   Timbers on the fourth   then the tiles
         
  A week later        
           
Swimming Pool          
     
Footings going in   Pool taking shape   Steel in.   Spa footings
           
Just add concrete